TMF Welding — notes from the workshop
Steel, plainly explained. Short technical pieces for builders and project managers, by the people who fabricate it.
- Website
- tmfwelding.com · all feeds from this site
- Feed URL
https://tmfwelding.com/feed.xml
Read it in your FeedListing reader
Or add to: Feedly Inoreader Raw feed
Latest posts
-
Steel for schools and public projects: what procurement asks for that private work does not
Public sector steel packages carry a prequalification layer, stricter material evidence and site rules private work never sees. None of it is hard — but it has to be priced and programmed, not discovered.
-
Mill certificates and traceability: what to ask your fabricator for
A mill certificate proves what the steel is. Traceability proves the certificate belongs to the piece in your building. They are two different things, and only one of them can be fixed after the fact.
-
What a steel subcontractor's prequalification pack should contain
Prequalification is where a head contractor decides whether you are worth sending drawings to. Most packs are held up for expired certificates rather than missing ones.
-
Tolerances: what “square and plumb” actually means on a steel package
Steel is never perfectly straight, and AS/NZS 5131 says how straight it has to be. Knowing the difference between essential and functional tolerances settles most handover arguments before they start.
-
Bolted or welded: choosing site connections on a steel package
Most Australian steel is shop welded and site bolted, for good reasons. Where a drawing calls for a site weld instead, it changes the access, the inspection and the tolerance — so it belongs on the drawings early.
-
Fire-rated steelwork: what the builder has to supply
Fire protection is priced off the fire resistance level, the section sizes and the protection system. If those three are not settled before fabrication, the steel gets blasted twice.
-
Construction categories: CC1 to CC4, and which one your steel package needs
AS/NZS 5131 sorts structural steelwork into four construction categories. Naming the wrong one costs you either inspection you never needed, or paperwork that does not exist at handover.
-
Shop drawings: what has to be settled before anyone cuts steel
Shop drawings turn an engineer's design into the pieces a workshop actually makes. Four things hold them up every time, and all four are decided before fabrication starts.
-
Galvanised, painted or duplex: choosing a steel finish in South East Queensland
The finish is chosen from where the steel is going and how long it has to last — not from the price line. Here is how the decision is actually made, and what it does to your programme.
-
GP or SP? AS/NZS 1554.1 weld categories in plain English
AS/NZS 1554.1 sets two weld quality categories. Which one applies changes the inspection, the rework risk and the paperwork you get at handover — so it belongs on the drawings.
-
Stairs, balustrades and access platforms: the standards your steel has to meet
Steel stairs and barriers answer to more than one rulebook, and which one applies changes the geometry. It has to be settled before detailing, not at inspection.
-
The week the steel arrives: what a builder should have ready
A steel package can be right in every dimension and still lose a week on site. What decides it is settled before the truck is booked, not on the morning it turns up.