Analify - field notes
How business analysis is actually done: one artifact at a time, with the decisions behind it and what a reviewer would object to.
- Website
- analify.com · all feeds from this site
- Feed URL
https://analify.com/rss.xml
Read it in your FeedListing reader
Or add to: Feedly Inoreader Raw feed
Latest posts
-
A Requirements Pattern Library Worth Reusing
A requirements pattern library keeps shapes, not values. Eleven candidates from one case: seven admitted, four refused, then run back over the register.
-
Before the Migration Starts: What the Analyst Must Settle
A migration checklist for analysts: what the new process does with every case already open on switch-on day. Four cohorts, nine settlements, one case.
-
Writing an Integration Requirement Without Designing the API
An integration requirement names the fact that crosses, the event, the owner and the failure. Eight crossings in one case, and the design words to strike.
-
BPMN for the Path Where Things Go Wrong
Every place a case waits needs an event that can move it. Six waits in a returns case, drawn in BPMN, and four answers the notation forced.
-
Business Analyst or Product Owner: Who Owns the Requirement
One requirement cut into lines, and who can change each. The product owner holds the order, the analyst the wording, the rule owners the numbers.
-
Discovery Deliverables That Decide Whether Build Starts
One published case read against two public discovery checklists. Which deliverables can stop a build, which only prepare one, and the gap that decides.
-
Splitting a User Story Without Losing the Value
One story from a published case, run through nine splitting patterns. Which slices keep the point, which lose it, and what each has to carry.
-
Use Case, Sequence, Activity: Which Diagram Answers Which Question
Eleven questions asked of one published case, routed to the UML diagram that can answer each. Seven go to no diagram at all.
-
Reading a Data Model to Find the Rules Nobody Wrote Down
The data model a requirements register forces, drawn and read back move by move: eight rules the register never wrote down, and where each one goes.
-
Elicitation When Nobody Has Time to Talk to You
A case built with zero stakeholder minutes: what public sources settled, and six open questions sorted by whether silence can answer them.
-
Turning Acceptance Criteria Into a UAT Script
A UAT script names who acts, what they do, the result they should see and the acceptance criterion each step proves. One scenario, filled in and blank.
-
BRD or SRS: What Changes When Rules Meet a System
BRD vs SRS as one test: swap the system out and see which sentences survive. Run on all 19 rule and criterion lines of one worked case.
-
A Requirements Workshop That Ends With a Document
A workshop agenda built backwards from the document cells it must fill, an invite list read off decision rights, and three bins for whatever leaves the room.
-
Requirements Governance: Who Approves What, and When
Nine items on a status ladder, four approval gates and ten changes I counted in the case, replayed against a change policy. Reviewed is a rung below approved.
-
Gap Analysis Between Two Process Models, Line by Line
Every as-is row walked to its fate in the to-be, then every to-be line walked back. Two residual gaps, one shared verb and one step neither model draws.
-
Cutting Scope Without Cutting the Point
Eleven cuts a published case made and four it refused, each run through one test: on release day, is the problem the work exists to fix still there?
-
MoSCoW or WSJF: Prioritising When Everything Is a Must
Five requirements all marked Must, put through MoSCoW's own test and then scored with WSJF: what each method decides, and what it cannot see.
-
The Feasibility Memo That Recommends Not Building It
A feasibility memo that says no, derived from a worked case: four questions, each answered from the record, and the conditions that would turn it into a yes.
-
How Long Will the Analysis Take? An Estimate You Can Defend
Three clocks on one published case: thirteen hours of work, seven to nine hours a plan could name in advance, and twenty-eight days of calendar.
-
A Risk Register With Owners, Dates and a Trigger
A risk register derived from artifacts I already had: eight candidates pulled out of a published case, three thrown out for having no trigger, five rows kept.