EmbeddedEra Engineering Notes
Notes from the bench on PCB design, firmware, and obsolete-part redesign — practical, written by the engineer who does the work.
- Website
- embeddedera.com · all feeds from this site
- Feed URL
https://embeddedera.com/rss.xml
Read it in your FeedListing reader
Or add to: Feedly Inoreader Raw feed
Latest posts
-
How many parts to buy on a last-time buy
A way to size a last-time buy from build plan, scrap, spares and shelf life, plus the deadline traps in a discontinuance notice that change the number.
-
How to pick an I2C pull-up resistor value
Work out the smallest and largest I2C pull-up from supply, sink current, rise time and bus capacitance, then pick a value and check it on a scope.
-
Why KiCad DRC says USB-C pads A4 and B9 are shorted
Why a stock USB-C footprint trips DRC on stacked VBUS and GND pads, and the four ways to fix the symbol and footprint pair so ERC and DRC both pass.
-
Why a GT911 touch controller doesn't respond over I2C
Fix a GT911 touch panel that never answers: the INT address strap, reset sequence, status-register clearing and the schematic checks that prevent it.
-
Why an ESP32-S3 RGB display shifts or flickers with LVGL
What starves an ESP32-S3 RGB panel of PSRAM bandwidth, how bounce buffers and LVGL render modes differ, and the checks that separate flicker from tearing.
-
Why an NTC thermistor reads wrong on a microcontroller
Why a thermistor on an ADC pin drifts, jumps or reads high: divider placement, the curve math, self-heating and leads. Checks to run before you blame the chip.
-
Logging to an SD card without corrupting it on power loss
How to log to an SD card without corrupting it when power drops: when to sync FAT, where littlefs fits, and the hold-up hardware that matters.
-
Will a PCB antenna still work inside a metal enclosure?
Why a metal case detunes a PCB antenna, the three ways out (window, external antenna, or plastic section), and what to test before you cut tooling.
-
Ordering PCBs before a tariff exclusion expires
What the Section 301 exclusion deadline means for small bare-board orders, what to confirm with your broker, and what not to rush in the design.
-
Why a microcontroller ADC reading is noisy or wrong
Find out whether a noisy or offset ADC reading comes from source impedance, sample time, reference, layout or firmware, with a check order for each.
-
Preparing for the CRA 24-hour vulnerability reporting duty
What triggers a CRA report, the 24-hour, 72-hour and final deadlines, and the firmware and process pieces a small hardware maker needs in place first.
-
Choosing a display interface for a touchscreen product
SPI, 8080 parallel or RGB for a product display: what each costs in pins, RAM and memory bandwidth, and how to pick before the layout is frozen.
-
Why an IMU reads wrong once it's in the enclosure
Mounting stress, aliasing, clipping and offset calibration: the four reasons an IMU that worked on the bench misbehaves in a product, and the checks.
-
Why a load cell reading drifts with an HX711
Why load cell readings creep or jump with an HX711, and the wiring, reference, filtering and calibration checks that separate real drift from noise.
-
Why a current monitor reads wrong at 1 mA
Why an INA226-class shunt monitor misreads small currents, how to size the shunt, and when to switch ranges or measure sleep current another way.
-
Why an e-paper display ghosts after partial refresh
Why e-paper ghosts after repeated partial refreshes, what the vendor docs say to do about it, and the firmware rules that keep the panel readable and healthy.
-
Why a thermocouple reading is off by a few degrees
Where cold-junction error comes from on a thermocouple input, how to place the sensor and connector, and what to check before you trust the reading.
-
Why a PT100 or PT1000 reading is wrong by a degree or two
How lead wires, a drifting excitation current and the reference resistor throw off an RTD reading, and the front-end checks that fix each one.
-
Why a humidity sensor reads wrong inside an enclosure
Why humidity and temperature sensors read off once the case is closed, and the placement, venting, duty-cycle and test checks that fix it before tooling.
-
Why a USB-C board works on USB-A but not C-to-C
Why a board powers from a USB-A to C cable but dies on C-to-C, plus the CC resistor, receptacle and bench checks that find the cause before respinning.