Matthilda 17
The new deck laminate was ready for a light water wash with a scotch-brite pad, after which I sanded the new fiberglass to lightly scuff the entire surface and smooth the edges into the adjacent deck areas. At the same time, I performed some of the first surface prep work on…
-
Matthilda 16
Working steadily, I spent the morning laminating the new top skin for the main decks. I began by filling any remaining gaps between pieces of core or between the core and the adjacent deck areas, and also skim-coated the entire core surface and filled any open kerfs. Afterwards,…
-
Matthilda 15
In a day divided by a mid-day commitment, I finished up cutting the three layers of fiberglass for the main decks. To check the fit, and make sure I’d cut everything needed and properly overlapped the seams between layers, I took the time to spread all three layers out on deck.…
-
Matthilda 14
The first order of business was to remove the weights on the new foredeck core. I reserved the sandbags near the cockpit for later use in adding core to the cockpit sole, the last section requiring new core. For now at least, I was done with the plastic chainplate analogs, so I…
-
Matthilda 13
After a morning appointment, I got to work exposing the new foredeck core I’d installed last time. This all looked good and appropriately well-adhered. I test-fit the final two pieces of core for the foredeck, and cut out small sections of the core in way of the two pulpit base…
-
Matthilda 12
Over the weekend, I took a little time to prepare a blank for the replacement foredeck centerline stiffener. The original piece was 3/4″ plywood. I found two offcuts of 9mm okoume plywood which, when glued together, would make the required 3/4″ thickness, so I epoxied them…
-
Matthilda 11
Oooo, Friday the 13th…spooky. Getting the day going, I made simple paper patterns of the sidedecks and foredeck, breaking the area into four sections: the sidedecks and both sides of the foredeck. This would keep pattern size and core work at manageable levels throughout. For…
-
Matthilda 10
From time to time, as progress and editing time (and inclination) dictate, I’ll try to post some videos as the project moves forward. In video No. 1, I got the boat set up in the shop and removed all the deck hardware in preparation for the deck repair project. Enjoy! If you…
-
Matthilda 9
Before continuing work on the sidedecks, I decided to install the new top laminate for the coachroof. To that end, I began by vacuuming and solvent-washing the area to clean it properly after yesterday’s sanding work. I made a pattern of the inside of the cored area (the…
-
Matthilda 8
I removed the weights and plastic atop the new coachroof core, and removed the bracing from belowdecks. There’d be some additional work on this newly-cored area soon, including filling the small gaps between sections of core and sanding the resin coating the surface lightly to…
-
Matthilda 7
I spent 30 minutes or so on a final round of cleanup at the overhanging perimeters of the coachroof to ensure that I’d cleaned out all the old core as possible. In this instance, there was room beneath the reamed-out edges to slip new core; sometimes there is, sometimes there…
-
Matthilda 6
A quick inspection of the rubrail and some thoughts about its removal and replacement.
-
Matthilda 5
With only a short day, I decided to keep my focus on the coachroof, since I’d lose my work access to the coachroof if I started to uncore (decore?) the sidedecks, which I needed to get to the coachroof area. So I used a variety of tools to ream out any bits of old core […]
-
Matthilda 4
First thing, I attacked the backstay chainplate, and without too much trouble and in short order I managed to remove the tight bolts and free the chainplate. Access was the real problem–finding a sight angle that also allowed me to use a hammer to hit the bolt ends–but I found…
-
Matthilda 3
Continuing to remove deck hardware, my first order of the day was the main genoa tracks on each side. These seemingly original bronze tracks were in good condition, but the fasteners were recalcitrant and hte only way to back them off was to attach numerous sets of vice grips to…
-
Matthilda 2
Ready to start the project in earnest, I began by documenting the boat inside and out, starting with the hull. While deck core repairs were top of the priority list for this project and the owner’s budget, we hoped to be able to restore the hull as well, though not till the deck…
-
Building the AF4 38
In Episode 38, I bought some scrap lead and melted it down so I could form it into various-sized ingots to use for trim weight that I installed in the stern of the boat.
-
Matthilda 1
Shortly after her owner delivered Matthilda to the shop, I moved the boat indoors and positioned her where I wanted her for the winter. Then, with the trailer parked, I spent several minutes leveling the boat from side to side, making minor adjustments as needed to the trailer…
- August West Phase 2-8
-
August West Phase 2-7
Now that the fresh paint had cured for a few days, I felt comfortable to get to work on the few remaining items on my list, starting with reinstalling hardware as necessary. I began with the two small plastic fairleads, one located on each sidedeck. With new fasteners and butyl…