CO2 storage due diligence: what to check before you invest in a storage site
What technical due diligence on a CO2 storage project should check: capacity, the seal, old wells, injectivity, monitoring, permits and long-term liability.
-
Geothermal technical due diligence: what to check before you invest
What a geothermal technical due diligence should check before you invest or lend: the resource, the wells, the drilling plan, permits and contracts.
-
Owner's engineer scope of work: what to include, and what to leave out
Owner's engineer scope of work, phase by phase: what to include, what goes missing and returns as extra fees, and what to leave out to avoid paying twice.
-
How to write an owner's engineer RFP that gets you comparable bids
How to write an owner's engineer RFP: what to tell bidders, how to ask for price, which criteria to score, and the red flags to catch in responses.
-
Owner's engineer vs independent engineer: which one does your project need?
Owner's engineer vs independent engineer: who each one works for, when each joins a financing, when you need both, and why one firm should not do both.
-
Owner's engineer or project management consultant: what is the difference?
Owner's engineer vs PMC vs engineer of record: who is accountable for what, when one is enough, when you need both, and what to write into the RFP.
-
How much does technical due diligence cost, and what drives the price?
Technical due diligence cost depends on scope. What drives the price, how to scope the review to pay only for what matters, and the cost of skipping it.
-
Technical due diligence scope of work: what to ask for when buying an oil and gas asset
A technical due diligence scope of work for an oil and gas asset: six disciplines to cover, what to request from the data room and the report to demand.
-
How to choose a drilling and well engineering consultant
Comparing drilling consultant companies? What to check before you sign: rig experience, independence from the contractor, whole-well scope and red flags.
-
How to choose a geothermal consultant for a deep geothermal project
Choosing a geothermal consultant for deep wells? What separates deep from shallow firms, why oilfield well experience matters, and the questions to ask.
-
Hiring a decommissioning consultant: what they should do for you
What a decommissioning consultant should do on the owner's side, when to hire one, how they cut campaign contracting costs, and what to ask first.
-
Hiring a subsea engineering consultant: scope, questions and red flags
Hiring a subsea engineering consultant: when it pays off, what to put in the scope, which questions to ask bidders and the red flags to watch for.
-
What an owner's engineer does, and when you need one
What an owner's engineer does at each stage of an energy project, what the role never covers, and the signs you need one before you commit capital.
-
Owner's engineer, EPC or EPCM: who is actually working for you?
Owner's engineer vs EPC vs EPCM: whose money each one defends, where the conflict of interest hides, and when an owner needs an independent check.
-
Buying an energy asset? What technical due diligence should tell you before you sign
Technical due diligence in oil and gas: what a buyer should learn before signing, what to ask the seller, and where decommissioning and well risks hide.
-
Decommissioning liability: the number buyers and sellers get wrong
Decommissioning liability is often underestimated in asset deals. Why it happens, how it moves the price, and what makes a cost estimate you can trust.
-
Bid evaluation from the owner's side: why the lowest price is rarely the real price
Why the lowest bid is rarely the real price, and how to run an owner-side bid evaluation: criteria set first, hidden cost found, bids made comparable.
-
When is it too late to bring in an independent reviewer?
An independent technical review only changes outcomes while decisions are open. Where that point falls, from concept to operation, and how to spot it.
-
Before the first regulator meeting: what energy project owners should have ready
Regulatory approval for an energy project is not won with a pitch. What the regulator decides, what to bring, and the mistakes that cost months.